The project is located in Clallam County at milepost 1.547 on Mina Smith Road near Forks, Washington. The contract requires the contractor to replace (1) fish barrier culvert with a fish passable, contractor designed galvanized steel single radius structural plate arch supported on concrete stem wall footings including contractor designed welded wire faced structural earth walls and associated roadwork. Work also includes but is not limited to: (1) drainage ditch culvert with a Corrugated Metal Pipe, temporary traffic control, guardrail installation, temporary stream diversion, construction dewatering, clearing & grubbing, excavation, streambed construction, large woody material placement, site restoration, and paving.