The TASCR project will demo a total of eighteen (18) tenant spaces upon lease expiration from 2026 to 2028, and if warranted, update critical base building infrastructure to current PORT standards and applicable building codes. Upon completion, the PORT will provide the tenant with a cold shell for their buildout. Currently, the PORT anticipates most of the scope within the 18 spaces to be design for demolition only; however, potential upgrade/improvement design may be required and will be evaluated as each space is demolished and true as-is conditions are revealed to better inform any necessary repairs/modifications. Project design work is separated into two distinct categories: known demolition design and potential upgrade/improvement design. a. Known demolition design includes the removal of storefront finishes, signage, interior drywall and ceiling to expose metal studs, demolition of floor sinks and drains back to the source), and the removal of food service equipment and hood systems. All 18 spaces will undergo full interior demolition. b. Potential upgrade/improvement design includes the evaluation and/or upgrades to fire suppression systems, Tenant Demarcation Unit for tenant’s digital and analog communications systems, and grease waste piping. Reference Attachment 1: Scoping Documents for additional details specific to each tenant space.