Specifications include, but are not limited to: a. Relocate Doors: Relocate double entry interior entrance doors located on east wall to the North. Demo exiting double doors, salvaging single door, and frame for reuse. Install 3 5/8” metal studs (20 gauge) and lateral bracing (18 gauge). Install 3 1/2” fiberglass or rock wool sound batt insulation. Install, tape, and Level 3 finish GWB 5/8”. Demo existing stud wall. Reinstall and paint existing door and frame. Install new door hardware matching interior standard (S Hardware-Harney 70 Vertical Rod Exit device with lever set entry compatible with Schlage S-1 key cylinder). b. Remove Partition: Demo existing partitions, track and track soffit. c. Wall Finish and Specialties: Remove all items affixed to or hanging from walls. Clean, patch and repair walls with GWB Level 3 Finish. Paint walls Sherwin Williams, Eggshell finish. Color to be provided. Install fire extinguisher and cabinet to match existing. d. Remove and Reinstall Flooring: Remove all existing flooring, salvaging no less than 90% for reuse. Patch and repair concrete floor as necessary. Reinstall flooring using salvaged and owner-furnished tiles. Install 4.5-inch rubber base in Burnt Umber. e. Raise Ceiling: Demo existing suspended ceiling and install new suspended ceiling increasing ceiling height by two feet. Extend sheetrock, studs, and insulation to meet elevation of ceiling. Install 3 1/2” fiberglass or rock wool sound batt above grid. Install 3 5/8” metal studs (20 gauge) and lateral bracing (18 gauge) at 16”, include shade pocket, and transition soffit. Install, tape and Level 3 finish GWB 5/8” Suspend ACT ceiling using 2’x2’ grid throughout In corridor, suspend 2’x4’ grid to match existing Paint all walls in Sherwin Williams, Eggshell finish (Color to be provided).