Specifications include, but are not limited to: : Work includes a two phased renovation, which includes, but is not limited to the following: Phase One: Includes but is not limited to converting the storage room into an exercise room and two locker rooms, converting the exercise room into an open office area, dividing the mechanical room with a partition to create a separate storage room, renovating the existing shower, converting a storage closet into a shower, and adding drinking fountains to the upper level. Additionally, a VRF system for heating/cooling and an Energy Recovery Ventilator (ERV-1) for ventilation, which will include two mechanical units on the roof and (4) packaged units in interior spaces, will be installed.