Living Room Flooring: Remove and properly dispose of all flooring (~311 sq. ft, including asbestos-containing flooring located in layer 1, (tan floor tile, 8% chrysotile). Entryway Flooring: Remove and properly dispose of ~61.75 sq. ft. of all flooring (including asbestos-containing flooring located in layer 3, tan floor tile with black mastic, 8% chrysotile). Kitchen sink basin: Remove (disconnect from plumbing) and dispose of sink basin with black mastic undercoating, 6% chrysotile. Drywall Section: Remove all sheetrock and joint compound in the garage (4 walls and ceiling), joint compound contains <1% asbestos containing material. You will need to work around any preexisting garage door, electric, and lawn irrigation infrastructure. Unit 1954: Entryway Flooring: Remove and properly dispose of all flooring (~60 sq. ft.), including asbestos-containing flooring (layer 3, white sheet flooring with fibrous backing, 25% chrysotile). Garage (Unit 1954): Drywall Section: Remove all sheetrock and joint compound in the garage (4 walls and ceiling), joint compound contains <1% asbestos containing material. You will need to work around any preexisting garage door, electric, and lawn irrigation infrastructure.