The work to be performed by the consultant consists of preparing engineering design and environmental NEPA permitting for this project. The project aims to evaluate whether road safety may be improved along two key roadway segments: 60th St E (west of Sumner-Tapps Highway E) and 160th St E at Elm St E. Potential safety enhancements include edge-line profiled striping, high-visibility curve warning signs with advisory speeds and chevrons, signs with perimeter LEDs, radar speed feedback signs, and raised curbs within existing medians or two-way left-turn lanes. The specific improvements at each location will be determined through an engineering study based on site conditions and any identified safety needs. This project has a 0% DBE goal for the design phase.