A. CONDITION ASSESSMENT The Consultant will conduct a thorough interior and exterior coating inspection, corrosion investigation, and structural condition analysis of the 1 MG standpipe. If the standpipe is required to be emptied for inspection, coordination with the Port Townsend Water Department will be required such that there is mitigated adverse impact to water needs of the City. B. REHABILITATION PLAN Based on their Condition Assessment, the consultant will develop a rehabilitation plan for the 1 MG standpipe necessary to ensure that the new coating system meets all applicable water storage tank standards including but not limited to American Water Works Association (AWWA), Occupational Safety and Health Administration (OSHA), and Association for Materials Protection and Performance (AMPP) C. ADDITIONAL CORROSION CONTROL OPTIONS The consultant shall develop a plan to implement additional corrosion control options (i.e., cathodic protection). D. CONTRACTOR SELECTION The consultant will administer bidding assistance for rehabilitation of the 1 MG standpipe. Assistance shall include vetting questions regarding: ♦ Industrial coatings removal and application ♦ Welding repair of steel potable water storage tanks ♦ Corrosion mitigation ♦ AWWA Standards