Specifications include, but are not limited to: The Contractor shall furnish all labor, tools, equipment, supervision and specific materials to perform the work specified in these Contract Documents for the Priest Rapids Dam Turbine & Generator Building Project located at 29086 Highway 243 S, Mattawa, WA 99349. MOBILIZATION Mobilization shall consist of preparatory operations performed by the Contractor, including, but not limited to, those necessary for the movements of its personnel, equipment, supplies and incidentals to the project site for the establishment of its field office, buildings and other facilities necessary for work on the project for premiums on bonds for the project and for other operations which it must perform or costs it must incur before beginning work on the various items on the project site. Mobilization shall be limited to 5% of the Total Base Bid Price. No progress payments shall be allowed on this payment. Mobilization shall be identified on the Contractors Schedule of Values. SR-6 DE-MOBLIZATION De-mobilization shall consist of project closeout activities, cleanup and delivery of final submittals and O&M manuals. De-mobilization shall be a minimum of 5% of the Total Base Bid Price. No progress payments shall be allowed on this payment. De-mobilization shall be identified on the Contractors Schedule of Values. SR-7 NOISE CONTROL A. The Contractor shall take special precautions to reduce the noise level from work activities. Noise of work shall be kept from exceeding, as a criterion, the NCA 45 curve inside rooms of adjoining buildings with windows kept closed. B. All operations shall be conducted in such a way that employees of the Contractor and District or any other persons are not subjected to noise levels in excess of those prescribed in the WalshHealy Act, on occupational noise exposure. C. No blasting, air-hammering, excavation or other high noise level operations as determined by the District shall be permitted outside of daylight hours. SR-8 CONTRACTOR WORK HOURS All work required to be performed by Contractor shall normally be done between the hours of 6:00 a.m. and 4:30 p.m., Monday through Friday, exclusive of District legal holidays or as identified in the approved schedule. Contractor shall provide a minimum 72 hour notice to the Districts Representative if at any time it becomes necessary or Contractor desires to work at times other than those specified herein or as approved in advance by the District. Approval of any proposed alternative work schedule shall be at the sole discretion of the District Representative. For every hour the Contractor works in excess of the approved work schedule, or works in excess of 40 hours per week, the District shall deduct and retain from the Contract Price, $125.00 per manhour to cover the District's direct and incidental costs including overhead and overtime payroll costs, required for the inspection and observation of work performed outside of the normal work hours specified above or as identified in the approved schedule. If the unapproved hours or excess hours increase the number of days of work per week, two hours will be charged, in addition to the actual hours, for Districts additional travel and preparation time. District legal holidays are as follows: New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day. If a holiday falls on Saturday, it will be observed on the previous Friday. If a holiday falls on a Sunday, it will be observed on the following Monday.