Installation of approximately 215 linear feet of water pipeline, including 177 LF of 14-inch HDPE DR11 and 38 LF of diameter CL50 ductile iron pipe, with 40 LF of 24-inch C-900 PVC casing at the deepest portion of the installation (will be below a future culvert to be constructed by Others). The project also includes the installation of approximately 177 linear feet of 2-inch HDPE fiber optic conduit. All installation is to be done by traditional trenching methods along Lake Samish Road, west of Interstate 5 Interchange southbound off-ramp, in unincorporated Skagit County, State of Washington. Work includes asphalt removal and replacement, rock excavation, shoring, traffic control, and pressure and purity testing of the pipe, and site restoration, along with incidentals and appurtenances, such as valves, fittings, dewatering, in estimated quantities identified in the Bid Proposal.