Task 1 – Project Management and Quality Management • The Consultant will be responsible for managing, administering, monitoring, controlling, and coordinating the work defined in the contract. This task represents the labor and expenses associated with scheduling, coordinating, reporting, conducting quality management of deliverables, and communicating with SPU regarding services for this work. The Consultant will be familiar with Earned Value Management and will report project progress using EVM graphics and statistics. The Consultant must submit to SPU a schedule with deliverables and dates within 20-days of Notice to Proceed. Task 2 - Marine Corrosion Engineering and Structural Analysis • Review design and as-built construction documents for the pumping system. Review previously completed inspection and analysis studies of the pumping system. The completed study documents to review will include (but may not be limited to) the following: o Video and photographs o Ultrasonic thickness and pit depth gage measurements. • Complete Three-dimensional (3D) ultrasonic thickness (UT) scan of one representative vertical pile. • Develop and run a finite element model of one mooring pile under dynamic, wave-loaded conditions while a pump station is attached to its mooring piles. Task 3 – Options Analysis • Develop three (3) project options at a conceptual level. Examples of potential options include: o Install impressed current cathodic protection o Remove and replace piers and other corroded members with items designed to better withstand condition in the reservoir • Assess options with model.