Specifications include, but are not limited to: This prequalified contract work consists of providing all labor, materials and equipment necessary to relocate approximately 1,200 feet of existing overhead distribution facilities with a new underground distribution system. Work includes installation of a new joint trench, conduits, vaults, cables, and pad-mounted equipment from the SW corner of State Avenue to Alder Avenue as well as removal of the old overhead power facilities. Telecom companies will be responsible for installing their own vaults, cables, and equipment as well as removal of their overhead facilities. The CONTRACTOR shall be responsible for the restoration of all surfaces disturbed in association with the installation of the joint trench. This includes paving, concrete and landscaping. All restoration work shall be per the District standards and/or the City of Marysville's asphalt and concrete restoration requirements.