The project includes the following work: Installation of (22) distribution poles and framing, reframing of (1) distribution pole, installation of 3,037 circuit feet of distribution feeder conductors, installation of 125 circuit feet of distribution conductors, installation of 160 circuit feet of spare conduits for future conversion of feeder circuit to underground, installation or replacement of 305 circuit feet of 3 phase underground primary in various locations, installation or replacement of 845 circuit feet of 1 phase underground primary in various locations, all associated overhead and underground secondary conductor relocations or installations, including but not limited to all associated overhead equipment (poles, framing, guys, anchors, conductors, gang switches, transformers, etc.) and underground equipment (trenches/bores, conduits, select backfill as designed, cables, J-Boxes, risers, pedestals, secondary J-Boxes, terminations, tagging, etc.), all removals and site restoration as required, and other associated work as described in the Summary of Work. All work is to occur along NE 179th St from NE 26th Ave to east of NE 29th Ave, and along NE 29th Ave north and south of NE 179th St.