Specifications include, but are not limited to: The work to be performed by the CONSULTANT consists of performing Professional Surveying, Engineering and Design work required for the completed design of the Main Street Corridor Intersection Enhancements Project. The proposed project includes improvements to existing traffic signals along Main St. at Manitoba Ave., Third Ave., Fifth Ave., and University Way. Enhancements will include the installation of new signal heads, upgrading to protected/permitted left turn phasing, video/radar detection, new pedestrian push button poles with ADA accessible push buttons, and new signal poles/cabinets as needed. Signal timings along the Main St. Corridor will be updated and optimized as part of this project. Associated ADA and drainage/utility work will be performed as needed. This project has a Zero UDBE goal. The preliminary estimate for the engineering and construction of this project is 1.3 million dollars.