Lift Station #5 Lift Station #5 (LS5) was constructed in 1973. The existing LS5 is located at 3607 Ryan St SE, Lacey, WA, 98503. The new replacement lift station will be located across the street at 3300 Ruddell Rd SE, on City-owned property. There will be approximately 50’ x 100’ area dedicated for the new lift station and appurtenances on the City-owned property. The City does not anticipate acquiring additional easements or right-of-way for this project. LS5 is a two-pump wet pit/dry pit pump station with aging infrastructure and equipment. It needs mechanical upgrades, does not have standard Lacey wastewater lift station components, and has limited access for operation and maintenance. Additional information about LS5 includes: • LS5 has two pumps with capacity of 150 gpm at 39 ft TDH and 5 hp. • Utility power is 120/240/1 phase. • It has a permanent on-site standby generator of 40kw. • The wet well diameter is 48-inches. The scope of improvements for the LS5 project includes, but may not be limited to: • Relocation of the lift station along with all the requirements to build a new lift station and associated piping, • Installing motion-sensor lighting on back of property, • Installing approximately 520 feet of new sewer force main to accommodate design flows and abandoning the existing sewer force main This project may include additional lift stations that may be added to the proposed Professional Services Agreement as requested by the City The City anticipates the design of the project will begin in late 2026 with construction occurring in 2027. SCOPE OF EFFORT AND TIMING Task 1: Site Investigation and Data Review • Conduct site investigation and data review Task 2: Permitting/Environmental • Provide permitting and environmental assistance to the City to complete this project. • Permit Submittals - Prepare all site, building, environmental, and other applicable permitting documenters as requested. Note this may include a Conditional Use Permit/Special Use Permit and Hearing Examiner process. The City will be the point of contact for the Conditional Use Permit if required. • Stormwater - Comply with the latest Stormwater Design Manual project submittal process, if required. • Additional permits as required...