The work includes, but is not limited to, constructing 28,985 cubic yards of excavation, 18,065 cubic yards of embankment, 1,890 square feet of rock embankment, 640 square feet of rock retaining wall, installation of drainage culverts, 80 lineal feet of SRA buried structure, 24,545 tons of CSBC, 13,340 tons of CSTC, BST surfacing, 4,500 lineal feet of guardrail and striping on approximately 2.10 miles of road and other work, all in accordance with the Plans, Special Provisions, and the Washington State Department of Transportation 2025 Standard Specifications. Information regarding bidding procedures, Special Provisions, Bid Form, Contract Form, Drawings, Specifications, Contract Bonds, and Other Contract Documents may be examined at the following locations: