1 1-09 MOBILIZATION LS $ 1 $ 2 1-04 MINOR CHANGE FA $5,000 1 $5,000 3 1-05 MAINTENANCE BOND LS $ 1 $ 4 2-01 REMOVING CEMENT CONC. SIDEWALK SY $ 105 $ 5 2-01 REMOVING CEMENT CONC. CURB AND GUTTER LF $ 72 $ 6 2-01 REMOVING CEMENT CONC. EXTRUDED CURB LF $ 17 $ 7 2-01 REMOVING ASPHALT CONC. PAVEMENT SY $ 87 $ 8 5-04 PLANING BITUMINOUS PAVEMENT SY $ 74 $ 9 2-03 ROADWAY EXCAVATION INCL. HAUL CY $ 47 $ 10 7-01 STRUCTURE EXCAVATION CLASS B INCL. HAUL CY $ 11 $ 11 7-01 GRAVEL BACKFILL FOR PIPE ZONE BEDDING CY $ 3 $ 12 7-01 CORRUGATED POLYETHLYENE STORM SEWER PIPE 6 IN. DIAM. LF $ 23 $ 13 7-04 TESTING STORM SEWER PIPE LF $ 23 $ 14 7-05 CONNECTION TO DRAINAGE STRUCTURE EA $ 1 $ 15 REFER TO SCOPE DURATRENCH 6" PRECAST TRENCH DRAIN W GRATE LS $ 1 $ 16 8-04 CEMENT CONC. TRAFFIC CURB AND GUTTER LF $ 72 $ 17 8-04 EXTRUDED CURB LF $ 17 $ 18 9-03 CRUSHED SURFACING BASE COURSE TON $ 6 $ 19 9-03 CRUSHED SURFACING TOP COURSE TON $ 23 $ 20 5-04 HMA CL. 1/2 IN. PG 64-22 TON $ 22 $ 21 8-22 PAINTED LINE LF $ 75 $ 22 8-01 HIGH VISIBILITY SILT FENCE LF $ 30 $ 23 8-01 INLET PROTECTION EA $ 3 $ 24 8-01 WATTLE LF $ 45 $ 25 REFER TO SCOPE LANDSCAPE RESTORATION LS $ 1 $ 26 9-35 PROJECT TEMPORARY TRAFFIC CONTROL LS $ 1 $ 27 8-07 RED CURB PAINT - FIRE LANE LS $ 1 $ 28 1-08 TYPE A PROGRESS SCHEDULE LS $ 1 $ 29 REFER TO SCOPE CONSTRUCTION SURVEYING LS $ 1 $ 30 8-14 CEMENT CONCRETE SIDEWALK SY $ 15 $ 31 8-06 CEMENT CONC. DRIVEWAY ENTRANCE TYPE 1 SY $ 90 $