1. Hazardous Materials: A Limited Asbestos Survey dated December 21, 2022, is included in the specifications. Comply with all applicable laws regarding removal and disposal of hazardous materials. a. If materials not listed in the report are suspected of containing hazardous materials, Contractor is responsible of performing “Good Faith” testing as required per scope of work. b. Suspicion of hazardous materials is to be reported to owner as soon as possible and report of testing to be provided to owner. 2. The renovation of Building 9 envelope components as described in Contract Documents including but not limited to, supervision, labor materials, supplies, equipment, services, permits, and the manufacturing and fabrications of components performed, furnished or provided in accordance with the Contract Documents. 3. Removal and replacement of each unit’s kitchen and bathroom vents ensuring connection to duct work that properly vents out to exterior. All mechanical items (fans, duct runs, exhaust hoods and shrouds) are to be installed in accordance with current code requirements. Follow IMC Code section 403.4.7 for exhaust in the kitchens and bathrooms. Contractor to schedule owner walk-through of each unit after mechanical rough in.