• Base Bid: o Fabrication and installation of new wayfinding and interpretive panels atop the Don Kardong Bridge in accordance with the attached technical drawings and panel graphics. The project site is located atop the Spokane River on the Centennial Trail directly adjacent to 665 N. Riverpoint Boulevard, Spokane, WA 99202. Work includes but is not limited to: Fabrication & installation of (18) custom wayfinding panels Fabrication & installation of (5) custom angled interpretive panels Removal & salvage to the owner existing guardrail panels to be replaced by interpretive panels Production of shop drawings and working drawings as required in the attached technical drawings • Bid Alternates: o Bid Alternate 1: Lean Rail Fabrication & Installation Fabrication and installation of (2) new lean rails atop the Don Kardong Bridge in accordance with the attached technical drawings. • NOTE – The Don Kardong Bridge and adjoining portions of the centennial trail shall remain open to the public for the duration of on-site installation work. Contractor shall include in the bid all costs and activities necessary to secure panel installation sites & protect the public during construction activity.