The WORK to be completed includes, but is not limited to, demolition, abandonment of beach sewer laterals in place, grading, hot mix asphalt paving, cement concrete sidewalks, curbs, and gutters; electrical systems including service cabinets, generators, electrical lines, and junction boxes; installation of utility conduits and vaults; installation of sanitary sewer systems including package grinder pump stations, grinder pump station discharge piping, gravity sewer piping, a submersible pump station with valve vault, generator, and control and telemetry panel; sewer force main; traffic control; a water service line and connections; and residential plumbing assessment and construction, all in accordance with the Contract Plans, these Contract Provisions including the Technical Specifications, and the Standard Specifications.