The Work consists of the replacement of stairs, landings, elevated walkway, wood structure, foundations, railings, concrete sidewalk, liquid applied deck membrane and exterior painting. 2. Demolition a. Good faith asbestos inspection(s) testing to comply with RCW 49.26.013 as required to achieve scope of work. b. Stairs, landings, stem walls, foundations, structural materials, decking, railings, siding as necessary for proper deck flashing and concrete sidewalk. 3. New Construction (See Structural Plans for details.) a. Concrete foundations & steel post columns. b. Wood framed structure, soffit, and strip vents. c. Deck surface and waterproof membrane. d. Fiberglass railings. e. Deck structure per structural plans. 1) Joists to match existing configuration. 2) Joist hangers as required. 3) ¾” T&G CDX plywood 4) Wall to Deck Flashing – Kynar finish 5) Drip edge at front of deck – Kynar finish. 6) 1”x 12” fiber cement board fascia 7) Deck coating – Rhino Extreme, Rhino Lining of Auburn 253.735.1961 a) Epoxy primer coat. b) Spray applied waterproof membrane. c) Extreme appx 80-100 mil thick d) Base coat with quartz embedded. e) UV Topcoat (charcoal)