Specifications include, but are not limited to: • Furnishing all labor, equipment and materials (unless otherwise noted) necessary for the completion of the project • Provide and install Qty. 8 telco racks (23” racks) and cable management trays and horizontal ladder racking, suspended above racking to each rack • Provide and install PDU battery backup (do we need PDU to include branch breakers), including all required electrical work. Existing electrical panel 10’ away from center of racks. • Install generator plug on north side of building, with manual switch • Install fiber management ladder rack, fiber trough • Install light, convenience outlets and new sub panel • Completing and complying with all permitting as required