a. Furnish all labor, materials, tools, equipment, and supervision required in accordance with provisions of the Contract. b. Demo and remove all necessary elevator components scheduled for replacement: Including but not limited to the existing controller, Power Unit, Pipe Stands, Car Components, Hoistway Components, Pit Components, Car Door, Door Equipment, and Car Fixtures as described in these specifications for both the transmission building elevator and the secondary treatment elevator. c. Install a new controller in both the secondary treatment and transmission buildings. This will include: a. TAC-32 Controller b. Seismic Features c. Solid State Starters d. Battery Lowering in Controller e. eMax Monitoring Device Provisions...