Specifications include, but are not limited to:This project will convert approximately 3,400 square feet of ramp level office and service spaces into passenger holdroom space needed for off-gate/hardstand operations. This project will install common-use casework, as well as passenger amenities including new restrooms, and Wi-Fi. Electrical, mechanical, fire sprinkler, and communication systems will be reconfigured to meet the needs of the space. This includes heating, ventilating, air conditioning (HVAC), and plumbing systems. Access from the concourse level of the terminal building will be provided with a passageway from the existing escalator landing into the space. Exterior doors will also be installed with appropriate access control security. Outside the building, the project will provide a covered passenger walkway to the holdroom door