The subject property has been operated as a boatyard since approximately 1949 and has involved a number of operators under a lease with the Port. The property is awaiting a significant cleanup project in coordination with the Department of Ecology. Cleanup activities are anticipated in mid-2026 through mid2027 and will include construction of a new bulkhead, contaminated sediment dredging and disposal, upland environmental capping, and construction of two travel lift piers (30-ton and 200-ton). Following the cleanup project, the Port will then immediately be redeveloping the boatyard. Anticipated redevelopment improvements following the cleanup will include site grading, utilities, stormwater infrastructure and treatment, washwater infrastructure and treatment, floats and gangways, and security. Additional boatyard improvements may also be identified as the operational plan is finalized. The Port is seeking engineering and environmental services to plan, design, permit, and construct the proposed boatyard redevelopment. The project design will necessitate a civil, structural, and stormwater engineering components to integrate with the boatyard operational plan.