Specifications include, but are not limited to: The City of Tacoma (City) / Department of Public Utilities (TPU) / Water Division is soliciting bids to establish a contract for the construction of a new pressure reducing valve (PRV) station, located in unincorporated Pierce County near the Parkland–Spanaway–Midland communities. The project includes the installation of a City pre-purchased vault (base, solid wall center, and top), 12” Cla-Val, two (2) 12” FLxPE ductile iron spool pieces, miscellaneous piping, valves and appurtenances necessary to complete the work. The work will include delivering the vault components, excavation and setting the vault, multiple concrete cores on the vault (while in-place), installation of ductile iron main and fittings, making two connections to existing water main, constructing specialized concrete anchors on either side of the vault, and the installation of various transition couplings, valving, steel fitting fabrication, strainer, dismantling joint, and miscellaneous fittings in accordance with the project drawings. The Contractor shall do all demo and restoration work necessary to accomplish the aforementioned work and return the site to its current condition.