R-1. 1-05 SPCC Plan 1 Lump Sum Lump Sum $________ R-2. 1-05 Mobilization 1 Lump Sum Lump Sum $________ R-3. 1-07 Pedestrian Traffic Control 1 Lump Sum Lump Sum $________ R-4. 1-09 Project Temporary Traffic Control 1 Lump Sum Lump Sum $________ R-5. 1-10 Existing Irrigation Systems 1 Lump Sum Lump Sum $________ R-6. 1-10 Remove Existing Pavement, Class C6 1 Lump Sum Lump Sum $________ R-7. 2-01 Contaminated Soil Haul to Disposal 1 Lump Sum Lump Sum $________ R-8. 2-02 Site Health and Safety Plan 1 Lump Sum Lump Sum $________ R-9. 2-03 Site Health and Safety Officer 62 Cu. Yd. $________ $________ R-10. 2-03 Soil Management Plan 11 Ton $________ $________ R-11. 2-06 Crushed Surfacing Top Course 1 Lump Sum Lump Sum $________ R-12. 2-09 Erosion/Water Pollution Control 87 Sq. Ft. $________ $________ R-13. 2-09 Stormwater Pollution Prevention Plan (SWPPP) 11 Cu. Yd. $________ $________ R-14. 2-14 Roadside Restoration 1035 Sq. Yd. $________ $________ R-15. 2-16 Cement Conc. Sidewalk 2 Each $________ $________ R-16. 4-04 Cement Conc. Sidewalk, 6-In. Thickness 63 Ton $________ $________ R-17. 4-04 Colored Cement Conc. Sidewalk with Score Pattern 81 Ton $________ $________