This contract provides for a 2-inch HMA overlay on State Street between Maple Street and State Route 9 (approximately 600 ft) and State Route 9 to Rita Street (approximately 1150 ft). Overlay work will include planing and pavement markings on State Street. Other work elements include traffic control, temporary pavement marking, adjusting existing structures, full-depth pavement repairs, and curb ramp upgrades. The project also includes a 2-inch HMA overlay on Township Street between State Route 20 and State Street (approximately 2300 ft). Overlay work will include planing and pavement markings on Township Street. Other work elements include traffic control, temporary pavement marking, adjusting existing structures, installation of storm structures, full-depth pavement repairs, and curb ramp upgrades. The project also includes a 2-inch HMA overlay on Bingham Place from State Street to the cul-de-sac at the end of Bingham Place (approximately 850 ft). Overlay work will include planing on Bingham Place. Other work elements include traffic control, full-depth pavement repairs, adjusting existing structures, sidewalk repairs, curb and gutter repairs, and curb ramp upgrades. The project also includes a 4-inch HMA rebuild on Warner Street between Metcalf Street and Third Street (approximately 200 ft). Overlay work will include planing and pavement markings on Warner Street. Other work elements include traffic control, temporary pavement marking, and adjusting existing structures.