All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The 2023 Airfield Projects - Contract 2 consists of five work projects starting with the Perimeter Intrusion Detection System (PIDS) Infrastructure project which will install power and communication infrastructure for the PIDS technology project components consisting of Lidar, Radar and Cameras. The Snow Storage Expansion project expands both the north and south snow storage laydown areas available for stockpiling and managing snow on the airfield during winter storm events, as well as widening of the perimeter roadway for safe transit of snow removal equipment. The Secured Area Vehicle Checkpoint project will add vehicle gate arms and security screening equipment at the north and south ends of the terminal secured area. There will also be an extension of a mid-airfield power ductbank and lastly the installation of over height vehicle warning bars on the north end perimeter road to protect the Runway 16R FAA approach lighting system.