Specifications include, but are not limited to: No projects have been identified, nor is there a guarantee that any will be. However, it is anticipated that the task orders will support project types including, but not limited to, watershed improvement projects, such as those identified in the County’s Watershed Management Plans (http://www.fairfaxcounty.gov/dpwes/watersheds/) compliant with TMDL Action Plans, flood mitigation and stormwater management improvement projects with emphasis on stream restorations/stabilization using natural channel design principals, stormwater management facility and site retrofits, green stormwater infrastructure, wetland delineations, environmental, permitting, monitoring and other stormwater management projects. The scope of work may include surveying, drafting, engineering, construction document preparation, inspection, permitting, construction administration, cost estimating, monitoring, and the design of miscellaneous civil engineering and flood mitigation projects. Experience implementing stormwater capital construction projects using Fairfax County codes, Fairfax County’s Public Facilities Manual, and County processes are preferred.