- The length of the sidewalk is approximately eight hundred (800) feet. - The width of the sidewalk shall be a minimum of five (5) feet. - The depth of the sidewalk shall be a minimum of four (4) inches and meet Virginia Department of Transportation (VDOT) A3 graded concrete. - The interior of the existing curbed triangle island at Pell Avenue is grass. All grass is to be removed and replaced with concrete and detectable warning surfaces installed. - The existing ramp on the west end of the Pell Avenue intersection will need to be replaced and detectable warning surfaces installed. - Detectable warning surfaces will be placed at all other ramp areas. - The disturbed area around the newly installed sidewalk will be backfilled and reseeded as needed. - Wayfinding sign located Pell Avenue to be relocated in consultation with the Town. - A flagging plan will be necessary for this project. - Since the location of this sidewalk is largely in front of Franklin County High School, all work must be completed before school begins on August 21, 2025.