Specifications include, but are not limited to: The contractor shall furnish all labor, supervision, equipment, tools, parts and materials, as necessary, to perform the following service(s): Carefully remove the storefront system, replace with new aluminum frames and glass as per specifications and drawings attached. Remove the flashing and counterflashing at the base of the storefront along the rowlock brick. Install the storefront framing system on a continuous base flashing under the sill and, extending out and beyond the rowlock sill. Complete (2)- Approximately 25’ x 10’openings divided into 6 vertical sections with spandrel glass in the bottom section, horizontal mullions at 30” with bronze tempered units, horizontal mullions at 38” with bronze tempered units on top. Install (4) - approximately 10’ height – 4” x 4” bronze anodized posts for support. 2” x 4 ½” bronze anodized aluminum frames with 1” bronze tempered units and 1” spandrel units on bottom. Clean all glass and aluminum on completion of work. All work to be coordinated with the SWCC maintenance department in advance. All surrounding floors and roofing to be protected during the project. Plywood panels at window walls and leading to front roof. All old frames, glass, and debris to be disposed of off premises by the contractor.