Specifications include, but are not limited to: Contractor shall immediately proceed with snow removal without the approval of DMV when the accumulation of snow is three-(3)inches depth and it is continuing to snow. If the accumulation is less than three (3) inches, DMV’s CUSTOMER SERVICE CENTER’S manager or his/her designee shall determine the necessity for snow removal and notify the Contractor. ; The Contractor should be on site within two (2) hours of the notifying call. The Contractor shall be responsible for the removal of snow and/or ice from the facility’s parking lot(s), sidewalks and entranceways. ; The Contractor shall have available for snow and/or ice clearing services the necessary type of equipment needed to perform snow/ice removal services. ; The Contractor shall spread sand or chemically treated sand when surface icing has occurred. Sand and snow melting materials shall be provided by the Contractor as needed