The selected Contractor shall provide all permits, materials, labor, equipment, and supervision for the following: A. Shall remove existing roofing ballast, roofing membrane, and all flashing materials down to the existing structural wooden deck. B. Shall install high temperature 40ml underlay to entire roof surface. C. Shall install a new metal 26-gauge galvanized metal mill finish; 21 inch or 17-inch pans; double seamed, one-inch standing seam reveal with two factory boots on roof. Currently, roof has three boots installed; one boot shall be removed by contractor. D. Shall install 5” one-piece guttering and three (3) down spouts to rear of building. Down spouts shall measure approximately 10’ each. Building is 87 feet in length.