Specifications include, but are not limited to: 1. Route 1 Water Main Phase 1 Work Location: Route 1 from Neabsco Road to Dumfries Road (Route 234) • Site mobilization for both commencing and concluding all project activities • Clearing and grubbing along construction corridors • Installation of approximately 13,500 linear feet of 30” Ductile Iron Pipe water main • Installation of approximately 1,920 linear feet of 6” Ductile Iron Pipe through 24” Ductile Iron Pipe water main • Installation of 30-inch and 24-inch tie-ins • Other water main appurtenances of the Route 1 Water Main Phase 1 project including but not limited to air release assemblies with manholes, relocation of meters and tie-ins to existing connections as required and shown on plans • Installing 15 new Fire Hydrants and performing Service Line reconnections • Installing Corrosion Control Items 2. Route 1 Water Main Phase 2 Work Location: Route 1 from Dumfries Road (Route 234) to Fuller Heights Road • Site mobilization for both commencing and concluding all project activities • Clearing and grubbing along construction corridors • Installation of approximately 8,750 linear feet of 24” Ductile Iron Pipe water main • Installation of approximately 5,550 linear feet of 16” Ductile Iron Pipe water main • Installation of approximately 3,350 linear feet of 6” through 12” Ductile Iron Pipe water main • Installation of approximately 110 linear feet of 42” open cut steel casing pipe