Specifications include, but are not limited to: A. The Contractor shall perform the following work to the Administration Room and Hallway: 1. Remove existing mail slots and counter and relocate on the same wall to the left of the door. 2. Cut new grooves between existing mail slots and install Plexiglas shelving to create twenty-two additional mail slots. 3. Build a wall to divide Admin Room to create a new Interview Room. 4. Move base cabinets in Admin Room to the new wall. 5. Install top cabinets currently located in the File Room above base cabinets in Admin Room. 6. Patch and repair all wall areas and make ready for paint in hallway and interior of Admin Room. Paint to match existing walls. 7. Provide voice, data, and electrical connections for the two work stations in Admin Room and an electrical outlet to be located over base cabinet against new wall. B. The Contractor shall perform the following work to the new Interview Room: 1. Install a half wall approximately 3’ 6” tall to create a partition to evenly divide the client side and staff side of the Interview Room. Install one (1) bullet resistant unbreakable panel on upper half of wall to match the existing interview rooms. The bullet resistant glass barrier shall contain a portal for conversation and a separate portal used to transfer paperwork between the client and staff to match existing interview rooms. 11/16th inch - UL listed Level 1. The portal for conversation shall match existing interview rooms. 2. Install a laminate counter 24” to 30” deep on both the client and staff side to match existing interview rooms. 3. Frame new door jam and install new doors on both the staff and client side. The staff side door shall include a side light window measuring approximately 6 x 12 to match existing interview room doors. 4. Patch and repair all wall areas and make ready for paint. Paint walls and new door frames to match existing walls. 5. Install voice and data on the staff side of the Interview Room. Contractor shall also install two electrical outlets on the staff side and one on the client side. 6. Install tile floor in interview room (staff & client side to match existing interview rooms). 7. Ensure security is not breached in construction of new interview room when creating doorway. C. The Contractor shall perform the following work to the Mail Room (Located next to existing small conference room): 1. Remove base cabinets located to the right as you enter the File Room and relocate to the new Mail Room (against wall of existing conference room). 2. Install new dedicated electrical & data line for a copy machine in the Mail Room. 3. Relocate existing data lines on wall above base cabinet.