Specifications include, but are not limited to: The Contractor’s staff shall be responsible for cleanup of any spillage or leakage on the property during the transporting of refuse and/or recycling away from collection areas. At the completion of each pick up, it shall be the responsibility of the driver of the equipment to clear the immediate/adjacent area(s) of any debris which may be a result of his actions–by whatever method. Waste/recycled materials that are blown by the wind shall be recovered and disposed of by the equipment operator or his/her assistant. In no case shall the operator leave a site with waste materials in the area. The Contractor shall make provisions for all containers to be supported in such a manner as to minimize tipping or spilling and shall be responsible for keeping the area around the containers free of garbage and refuse. The Contractor shall take reasonable precautions to prevent damage to roadways, and any other areas.