Specifications include, but are not limited to: removal of approximately 279 squares of existing fully adhered EPDM roof and rigid insulation down to existing wood roof decking and the removal of approximately .65 square of existing fully adhered EPDM roof and rigid insulation down to existing concrete roof decking. A new fully adhered TPO roof and thicker rigid insulation will be installed. All metal downspouts and gutters will be removed and replaced with new for the work sections indicated on the Drawings. The existing hidden gutters (approximately 806 Linear Feet) will have the existing lining removed and a new EPDM lining installed. Also, the existing soldered seams of the copper copings will be lined with EPDM form flashing.