Specifications include, but are not limited to: Proposed Bridge Repair of Central Boulevard over Sandy Creek. The Contractor will be responsible for the fabrication of all signs for traffic control. The contractor will be responsible for fabrication and erection of signs as described in paragraph K, page 2-5.The Contractor agrees to commence work and complete the project in accordance with the time period set forth in the written "Notice to Proceed". The project shall be completed on or before May 29, 2020. Water required for these repairs will be provided to the Contractor free of charge. Water service will be provided for the Contractor's use in obtaining water for this project. The location of the water service will be determined by the Engineer.