Specifications include, but are not limited to: Provide materials and labor for the removal and replacement of approximately 100 feet of piping, valves, strainers, fittings, dielectric fittings, pipe hangers insulation and other needed items for soft water supply to Deaerator Tank for Power Plant boilers. Replacement of piping shall be with Type L copper and Pro Press fittings of correct size and specification for delivery of process water. Dielectric fittings will be installed as appropriate between dissimilar metals. Installation of insulation shall be fiberglass formed pipe insulation and PVC covers at the bends and removable insulation jackets for valves. Install owner supplied Auto Fill valve and assure correct operation. Install a Bypass pipe with Globe valve for bypassing Auto Fill Valve in case of the failure of Auto valve. Check all replacement items for correct operation and no leak status.