Specifications include, but are not limited to: The milled roadway areas that are to be opened to traffic, excluding curb and gutter sections, shall have drainage outlets cut through the shoulder at locations designated by the City of Poquoson. The Contractor shall plan and execute the milling operation to avoid the trapping of water on the roadway. Drainage outlets shall be restored to original grade, unless otherwise directed by the City of Poquoson. The Contractor shall plan and execute a schedule of operations so that milled roadways will be overlaid with asphalt concrete as soon as possible. In no instance, shall the time lapse exceed five (5) days after the milling operations, unless otherwise specified. The milled areas of the roadway shall be kept free of irregularities and obstructions that may create a hazard or annoyance to traffic in accordance with the requirements the most current version of the VDOT Road and Bridge Specifications. A short ski or shoe shall be used to match the grade of the newly overlaid adjacent travel lane on primary, intersections, and secondary roadways.