Specifications include, but are not limited to: mobilization; maintenance of traffic; construction stake-out; coordination with the University and the University’s representatives on site; erosion and sediment control; demolition; grading; raising / lowering of manholes, valve covers, hand holes, or drop inlets; aggregate base and aggregate subbase course; asphalt course; storm drain installation; pavement markings and striping; curb painting; hot sealer application; seal coating application; pot hole repair; relocation or addition of wheel stops installation or removal of signage; installation of curb and gutter; seeding; site restoration and clean-up; and all incidental work needed to perform complete and useable pavement maintenance and repairs.