Specifications include, but are not limited to: 001000098MOBILIZATION EMERGENCYEA25.000_________.______________._____ATTD002000098MOBILIZATION NON-EMERGENCYEA25.000_________.______________._____ATTD 514003000099MOBILIZATION CONTRACTESTABLISHMENTLUMP SUM_________._____LUMP SUMATTD004000118EXCAVATION ROCKBLASTINGCY1,250.000_________.______________._____ATTD/303005000118EXCAVATION ROCK NON -BLASTINGCY1,250.000_________.______________._____ATTD 303006000118EXCAVATION ROCK SIZINGCY500.000_________.______________._____ATTD 303007000120REGULAR EXCAVATIONCY2,500.000_________.______________._____303008000536CONCRETE CONCRETEBUTTRESSCY250.000_________.______________._____ATTD009002090PIPE DRAIN PIPELF1,000.000_________.______________._____ATTD010002090PIPE OUTLET PIPELF50.000_________.______________._____ATTD011002097SPEC. DESIGN SHOTCRETEFACING (WITHOUTREINFORCEMENT)SF45,000.000_________.______________._____ATTD012002097SPEC. DESIGN SHOTCRETEFACING(WITHREINFORCEMENT)SF22,500.000