Specifications include, but are not limited to: 1. The Contractor shall supply all consumable supplies, qualified supervision and labor, and equipment to provide all services described. Should any area of operation not be satisfactory to the Virginia Tech representative's inspection of work, the Contractor shall make the area satisfactory at the Contractor's sole expense. All furniture and furnishings shall be restored to their proper locations after operations have been completed. Virginia Tech reserves the right to correct or dispatch additional resources for any work not performed as outlined in the contract and or quote. 2. The contractor will ensure the entrances they use to service a facility after hours or if the building is unoccupied when the service is performed will be locked. After completion of their tasks, the contractor will verify the building is locked and secured before leaving.