Specifications include, but are not limited to: The selected A/E firm shall provide the full range of architectural and engineering services for design and construction of a replacement Central State Hospital. The new facility will encompass approximately 428,500 square feet, and will provide a total of 252 in-patient beds, comprised of 111 maximum security and 141 civil beds. The scope of the project will include patient treatment/program areas and administrative and support services space. The design will anticipate the construction of a future 48-bed addition. This future addition will be designed through preliminary documents only. The new facility is envisioned to be two-stories, with delineated treatment areas for maximum security and civil patients, and secure enclosed courtyards for outdoor recreation of those committed for care. An integrated system of security, safety and information technology will be required. The selected A/E shall furnish all expertise, labor and resources for complete design and construction period services for the project in accordance with the requirements of the A/E Manual. The following generally highlights the services that the A/E will be required to perform: A. Refine, clarify, and define the Agency’s project description, data, and requirements as necessary to develop a Schematic design of the project which meets the Agency’s requirements and is within the stipulated “design-not-to-exceed” construction cost. Respond to all DEB and other agency review comments and resolve outstanding design issues at the various phases by taking appropriate action in the design of the project. Completion of approved Schematic Design documents is to be no later than 31 March 2020. B. Develop a Preliminary Design submission consistent with the requirements of the A/E Manual. Respond to all DEB and other agency review comments and resolve outstanding design issues prior to submission of construction documents. Completion of approved Preliminary Design documents is to be no later than 28 September 2020. C. Provide complete construction contract documents with professional seals and signatures in accord with the procedures of the A/E Manual. Documents must be complete and ready for bidding not later than 28 October 2020 for Early Site Package, 29 December 2020 for Early Foundation and Structural Steel Package, and 27 March 2021 for remainder of Building Package.