Specifications include, but are not limited to: A. The project includes bridge repairs to the N. Boulevard Bridge over CSX (127-1853). The project scope consists of removal and replacement of the transverse expansion joints. All work shall be in accordance with the project terms and conditions, project drawings [O-28832], VDOT specifications, and project special provisions. B. The contractor shall obtain all permits associated with the work performed. The costs of permits shall be incidental to the Mobilization costs, per special provisions. C. Lane closures are prohibited 7:00 AM – 9:00 AM and 4:00 PM – 6:00 PM Monday through Friday. Extended weekend lane closures are permitted from 7:00 PM Friday to 6:00 AM following Monday except VCU graduation events and weekend baseball games. Overnight weekday lane closures are permitted from 7:00 PM to 6:00 AM following day. D. The Contractor shall be responsible for coordinating all traffic control and work-in-streets permits within the project area. The Contractor shall exercise cooperation with other Contractors per VDOT specification Section 105.09.