Specifications include, but are not limited to: 1. Contractor will furnish all labor, materials, tools, equipment and transportation necessary for the proper execution of any of the work in accordance with the contract document, and all incidental work necessary to complete the project within the allowable timeframe and an acceptable manner. 2. The purpose of this solicitation is to establish a contract for the moving of classroom and office furniture, fixtures and equipment, for activities associated with the additions and renovations to Cave Spring High. 3. The Contractor shall perform classroom, office, and ancillary spaces moves during office hours, at night, and on weekends as required by RCPS to accommodate the construction schedule. 4. The majority of the work performed under this contract will be required to be performed during normal RCPS working hours (7:00 a.m. to 5:00 p.m.). However, the contractor is also expected to perform work after hours and weekends and RCPS holidays as may be required. Bidders should consider this work schedule when determining unit pricing. 5. Work shall begin no earlier than 7:00 AM on Thursday, December 20, 2018 and shall conclude no later than 5:00 PM, December 31, 2018. 6. The hourly contract price shall include all vehicles, equipment, moving materials, and labor to fully execute the move. 7. All furniture, fixtures, equipment, and boxes shall be moved from the existing Cave Spring High School to either an on-site modular classroom/office village, on-site dumpsters, onsite storage, or loaded into an RCPS truck. The modular village is located in the practice field, across the parking lot from the school (see attached Location Map). Additionally, six (6) classrooms of furniture, fixtures, equipment, and boxes will be moved from the existing Cave Spring High School to Cave Spring Middle Schools. The two schools are approximately 2 miles apart. 8. Contractor is required to contact Roanoke County Public Schools two (2) weeks prior to the move date to discuss and confirm scheduling. 9. A foreman must be present on-site at any time work is being performed. 10.The hourly billable rate begins upon arrival at the Cave Spring High School site. 11.Estimates of hours to fulfill the contract shall be provided on the Price Form.