Specifications include, but are not limited to: The Work under this Project includes but is not limited to: Furnish all labor, equipment, and material, supplies, temporary traffic control measures, permits, and fees to install a precast master meter vault beneath Miller Store Road. The work will include a precast meter vault housing two (2) magnetic flowmeters, two (2) pressure transducers, float operated sump pump, and all associated piping and valves as shown on the Contract Drawings. The work also includes all necessary piping on the exterior of the vault in order to provide a complete tie-in to the existing 20” water main. Contractor will also supply a solar panel and transclosure on the North side of the road that will power all items in the vault and house a remote telemetry unit to transfer all data back to the City of Norfolk SCADA system. Work includes abandonment of approximately 4200 feet of existing 20” water main located along the corridor between the intersection of Miller Store Road and Burton Station Road and Interstate 64. Work also includes the abandonment of an existing metering vault on Amphibious Drive as directed in all supplemental documentation provided by the Owner.