Specifications include, but are not limited to: The Project consists of constructing proposed improvements from Route 177 (Tyler Road) to 1,024 +/- east of Route 177 (Tyler Road), and generally consist of new construction of a two-lane section of Meadow Creek Road with four-foot bike lanes and sidewalks on both sides of the roadway and a new cul-de-sac on Route 627 (Barn Road). Bids will be received for a single prime Contract. 100 MOBILIZATION 1 LS 101 CONSTRUCTION SURVEYING (CONSTR.) 1 LS 110 CLEARING AND GRUBBING 1 LS 120 REGULAR EXCAVATION 9235 CY 525 CONCRETE CLASS A3 MISC. 1 CY 588 UNDERDRAIN UD-4 1059 LF 595 OUTLET PIPE 44 LF 1156 STORM SEWER PIPE 15" 644 LF 1186 STORM SEWER PIPE 18" 330 LF 2090 NS PIPE (15" CORR. METAL PIPE) 21 LF 6150 15" END SECTION ES-1 OR 2 2 EA 6818 DROP INLET DI-3B, L=6' 3 EA 6819 DROP INLET DI-3B,L=8' 1 EA 6820 DROP INLET DI-3B, L=10' 1 EA 6821 DROP INLET DI-3B,L=12' 1 EA 6837 DROP INLET DI-3C,L=10' 2 EA 7510 DROP INLET DI-7A 2 EA 9056 MANHOLE MH-1 OR 2 15.8 LF 9057 FRAME & COVER MH-1 2 EA 9148 EROS.CONTR.STONE CL. A1 EC-1 4 TON