Specifications include, but are not limited to: • Mobilization: Limited to a maximum of three percent (3%) of the total of all other items. • Horizontal Split-Case Pump Installation – Replacement of two existing horizontal splitcase pumps with two new horizontal split-case pumps and installation of a third new horizontal split case pumps and all related work as shown in the Contract Documents and as necessary for the prosecution of Work. • Pump Control Valves – Replacement of two existing pneumatic type pump control valves with two new 12-inch diaphragm pump control valves and installation of a third new 12- inch diaphragm pump control valve. • Electrical and Instrumentation – Installation of all electrical equipment and related work for the new horizontal split case pumps and pump control valves, installation of a new PLC, installation of a new Communications Panel (including all instrumentation equipment), installation of security equipment, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work.