A. Milling of existing asphalt paved areas as identified on the Project Overview Plan to remove distressed asphalt and dispose of materials off-site in accordance with all applicable County, City, State and Federal requirements and guidelines. i. Milling and removal of pavement as necessary to tie‐in to existing entrances, concrete, utility structures, sidewalks, and other existing features, as well as to provide a smooth transition along the proposed work and maintain existing drainage patterns. The Contractor shall ensure that all areas drain appropriately and that there are no low areas that will hold water. ii. Ensure a smooth transition between new pavement and all existing surfaces. B. Replacement of all existing pavement markings. Pavement marking shall match the color, location, and designation of the existing markings. C. Removal of existing wheel stops and installation of new car stops per locations set forth in the Project Overview Plan following the completion of paving operations.